<h2 class="form">Description</h2>
<blockquote>
During the design phase of the project, this function can be accessed by members of the Design Project Team. By default, these checklist items are not included in the Bid Package or made part of the contract (i.e., it is a noncontractual item). This means that the checklist item can be modified during the advertisement period without the need for an addendum.
<p>The following standard checklist items are categorized as this type. They each require a PENNDOT Approval Date, an FHWA Submission Date, an FHWA Approval Date, and, if applicable, a Meeting Date, and a Meeting Minutes Submission Date. Each checklist item may also contain a link to an EDMS document(s).<br /></p>
</blockquote>
<h2 class="form">PennDOT/FHWA Approval Checklist Items</h2>
<blockquote>
<table border="1">
<tbody>
<tr valign="top">
<td width="202" style="font-family: Arial; font-size: 80%">Approval and Justification Letter for Road User Damages</td>
<td width="334" style="font-family: Arial; font-size: 80%">Special Equipment Field Office Approval Letter</td>
</tr>
<tr valign="top">
<td width="202" style="font-family: Arial; font-size: 80%">Approval and Justification Letter Non-Use of Alternate Design Structures</td>
<td width="334" style="font-family: Arial; font-size: 80%">State Furnished Equipment or Materials Approval Letter</td>
</tr>
<tr valign="top">
<td width="202" style="font-family: Arial; font-size: 80%">Design Exceptions Approval Letter</td>
<td width="334" style="font-family: Arial; font-size: 80%">Constructability Review(s)</td>
</tr>
<tr valign="top">
<td width="202" style="font-family: Arial; font-size: 80%">Designation of Waste and Borrow Areas Letter</td>
<td width="334" style="font-family: Arial; font-size: 80%">Design Field View</td>
</tr>
<tr valign="top">
<td width="202" style="font-family: Arial; font-size: 80%">Experimental Features or Items Approval Letter</td>
<td width="334" style="font-family: Arial; font-size: 80%">Final Design Office Meeting (FDOM)</td>
</tr>
<tr valign="top">
<td width="202" style="font-family: Arial; font-size: 80%">Pavement Design (D-4332)</td>
<td width="334" style="font-family: Arial; font-size: 80%">Point of Access Study Approval (Conceptual and Final)</td>
</tr>
<tr valign="top">
<td width="202" style="font-family: Arial; font-size: 80%">Proprietary Items Approval Letter</td>
<td width="334" style="font-family: Arial; font-size: 80%">Safety Review(s)</td>
</tr>
<tr valign="top">
<td width="202" style="font-family: Arial; font-size: 80%">Retained Equipment Approval Letter</td>
<td width="334" style="font-family: Arial; font-size: 80%">Value Engineering</td>
</tr>
</tbody>
</table>
</blockquote>
<br />
<h2 class="form">Step-By-Step Directions</h2>
<blockquote>
<table border="1">
<tbody>
<tr valign="top">
<td width="151"><strong style="font-family: Arial; font-size: 80%">User Action</strong></td>
<td width="439"><strong style="font-family: Arial; font-size: 80%">Result</strong></td>
</tr>
<tr valign="top">
<td width="151" style="font-family: Arial; font-size: 80%">From the Project Development Checklist, click the checklist name hyperlink for the checklist item you want to update.</td>
<td width="439" style="font-family: Arial; font-size: 80%">The checklist detail screen appears.</td>
</tr>
<tr valign="top">
<td width="151" style="font-family: Arial; font-size: 80%">If desired, enter a user-defined title for the checklist item in the Title field.</td>
<td width="439" style="font-family: Arial; font-size: 80%">This title will appear on the main Project Development Checklist screen separated from the standard title by a dash. For example, &quot;Coordination Meetings - User Defined Title&quot;.</td>
</tr>
<tr valign="top">
<td width="151" style="font-family: Arial; font-size: 80%">Enter the date the checklist item was submitted to FHWA (or to the appropriate PENNDOT reviewer) in the Submission Date field. The date must be entered in mm/dd/yyyy format. (You can select the date using the Calendar/clock icon.)</td>
<td width="439" style="font-family: Arial; font-size: 80%">The date you entered or selected appears in the field.</td>
</tr>
<tr valign="top">
<td width="151" style="font-family: Arial; font-size: 80%">If applicable, enter the date of the meeting held with FHWA (or internally) to review the submission. The date must be entered in mm/dd/yyyy format. (You can select the date using the Calendar/clock icon.)</td>
<td width="439" style="font-family: Arial; font-size: 80%">The date you entered or selected appears in the field.</td>
</tr>
<tr valign="top">
<td width="151" style="font-family: Arial; font-size: 80%">Enter the PennDOT approval date. The date must be entered in mm/dd/yyyy format. (You can select the date using the Calendar/clock icon.)</td>
<td width="439" style="font-family: Arial; font-size: 80%">The date you entered or selected appears in the field.</td>
</tr>
<tr valign="top">
<td width="151" style="font-family: Arial; font-size: 80%">If applicable, enter the date the meeting minutes were submitted to FHWA. The date must be entered in mm/dd/yyyy format. (You can select the date using the Calendar/clock icon.)</td>
<td width="439" style="font-family: Arial; font-size: 80%">The date you entered or selected appears in the field.</td>
</tr>
<tr valign="top">
<td width="151" style="font-family: Arial; font-size: 80%">Enter the date the FHWA approved the checklist item in the Approved by FHWA field.</td>
<td width="439" style="font-family: Arial; font-size: 80%">The date you entered or selected appears in the field.</td>
</tr>
<tr valign="top">
<td width="151" style="font-family: Arial; font-size: 80%">If desired, enter comments regarding the checklist item in the Comments field.</td>
<td width="439" style="font-family: Arial; font-size: 80%">The text you entered appears in the field.</td>
</tr>
<tr valign="top">
<td width="151" style="font-family: Arial; font-size: 80%">If desired, attach an EDMS document to the checklist item by clicking the SEL EDMS button.</td>
<td width="439" style="font-family: Arial; font-size: 80%">See &quot;How Do I Attach an EDMS Document to a Checklist Item&quot;</td>
</tr>
<tr valign="top">
<td width="151" style="font-family: Arial; font-size: 80%">By default, the &quot;Include in Bid Package&quot; indicator is set to No and cannot be edited.</td>
<td width="439" style="font-family: Arial; font-size: 80%">This is a noncontractual checklist item.</td>
</tr>
<tr valign="top">
<td width="151" style="font-family: Arial; font-size: 80%">If the checklist item is complete, choose 'Yes' from the Completed radio button group.</td>
<td width="439">
<span style="font-family: Arial; font-size: 80%">The selected radio button appears with a darkened center.</span>
<p><strong><em style="font-family: Arial; font-size: 80%">Note</em></strong><em style="font-family: Arial; font-size: 80%">: This indicator has no effect on system processing. However, checklist items that are marked as completed appear with the 'completed' checkmark icon on the Project Development Checklist screen. This gives users an at-a-glance view of the project progress.</em></p>
</td>
</tr>
<tr valign="top">
<td width="151" style="font-family: Arial; font-size: 80%">When you are finished entering date, click the SAVE &amp; EXIT button to save the checklist item and return to the Project Development Checklist screen.</td>
<td width="439" style="font-family: Arial; font-size: 80%">The checklist item is saved, and the Project Development Checklist screen is displayed.</td>
</tr>
</tbody>
</table>
<br /><br /> </blockquote>
</body>
</html>

Description

During the design phase of the project, this function can be accessed by members of the Design Project Team. By default, these checklist items are not included in the Bid Package or made part of the contract (i.e., it is a noncontractual item). This means that the checklist item can be modified during the advertisement period without the need for an addendum.

The following standard checklist items are categorized as this type. They each require a PENNDOT Approval Date, an FHWA Submission Date, an FHWA Approval Date, and, if applicable, a Meeting Date, and a Meeting Minutes Submission Date. Each checklist item may also contain a link to an EDMS document(s).

PennDOT/FHWA Approval Checklist Items

Approval and Justification Letter for Road User Damages Special Equipment Field Office Approval Letter
Approval and Justification Letter Non-Use of Alternate Design Structures State Furnished Equipment or Materials Approval Letter
Design Exceptions Approval Letter Constructability Review(s)
Designation of Waste and Borrow Areas Letter Design Field View
Experimental Features or Items Approval Letter Final Design Office Meeting (FDOM)
Pavement Design (D-4332) Point of Access Study Approval (Conceptual and Final)
Proprietary Items Approval Letter Safety Review(s)
Retained Equipment Approval Letter Value Engineering

Step-By-Step Directions

User Action Result
From the Project Development Checklist, click the checklist name hyperlink for the checklist item you want to update. The checklist detail screen appears.
If desired, enter a user-defined title for the checklist item in the Title field. This title will appear on the main Project Development Checklist screen separated from the standard title by a dash. For example, "Coordination Meetings - User Defined Title".
Enter the date the checklist item was submitted to FHWA (or to the appropriate PENNDOT reviewer) in the Submission Date field. The date must be entered in mm/dd/yyyy format. (You can select the date using the Calendar/clock icon.) The date you entered or selected appears in the field.
If applicable, enter the date of the meeting held with FHWA (or internally) to review the submission. The date must be entered in mm/dd/yyyy format. (You can select the date using the Calendar/clock icon.) The date you entered or selected appears in the field.
Enter the PennDOT approval date. The date must be entered in mm/dd/yyyy format. (You can select the date using the Calendar/clock icon.) The date you entered or selected appears in the field.
If applicable, enter the date the meeting minutes were submitted to FHWA. The date must be entered in mm/dd/yyyy format. (You can select the date using the Calendar/clock icon.) The date you entered or selected appears in the field.
Enter the date the FHWA approved the checklist item in the Approved by FHWA field. The date you entered or selected appears in the field.
If desired, enter comments regarding the checklist item in the Comments field. The text you entered appears in the field.
If desired, attach an EDMS document to the checklist item by clicking the SEL EDMS button. See "How Do I Attach an EDMS Document to a Checklist Item"
By default, the "Include in Bid Package" indicator is set to No and cannot be edited. This is a noncontractual checklist item.
If the checklist item is complete, choose 'Yes' from the Completed radio button group. The selected radio button appears with a darkened center.

Note: This indicator has no effect on system processing. However, checklist items that are marked as completed appear with the 'completed' checkmark icon on the Project Development Checklist screen. This gives users an at-a-glance view of the project progress.

When you are finished entering date, click the SAVE & EXIT button to save the checklist item and return to the Project Development Checklist screen. The checklist item is saved, and the Project Development Checklist screen is displayed.




Previous Page


Created byLast Modified by
Joseph D Howe/PennDOT
on 03/16/2005 at 10:49:31 AM
Wanda Taylor/PennDOT
on 03/18/2005 at 02:59:03 PM