Bid Results and Bid Awards

<H2 class=form>Overview</H2>
<BLOCKQUOTE>Contract bids are open, checked, read, and entered into the bid screen immediately on bid letting day. Once bids results are entered and saved they will immediately be posted onto the ECMS Web site for the Web community to view. Bids are displayed by the lowest to the highest bidder amount per contract.
<P><BR><BR></P></BLOCKQUOTE><BR>
<H2 class=form>Fields</H2>
<BLOCKQUOTE><FONT face=Helvetica size=2></FONT>
<TABLE border=1>
<TBODY>
<TR vAlign=top>
<TD width=84><IMG height=1 alt="" src="/icons/ecblank.gif" width=1 border=0></TD>
<TD width=114>
<DIV align=center><B><FONT face=Arial size=2>State</FONT></B></DIV></TD>
<TD width=420><IMG height=1 alt="" src="/icons/ecblank.gif" width=1 border=0></TD></TR>
<TR vAlign=top>
<TD width=84><FONT face=Arial size=2>Letting Date</FONT></TD>
<TD width=114>
<DIV align=center><FONT face=Arial size=2>Protected</FONT></DIV></TD>
<TD width=420><FONT face=Arial size=2>The date that the contract was opened, read, checked and the results announced.</FONT></TD></TR>
<TR vAlign=top>
<TD width=84><IMG height=1 alt="" src="/icons/ecblank.gif" width=1 border=0></TD>
<TD width=114>
<DIV align=center><FONT face=Arial size=2>Protected</FONT></DIV></TD>
<TD width=420><FONT face=Arial size=2>Contains the contract number (CMS number).</FONT></TD></TR>
<TR vAlign=top>
<TD width=84><IMG height=1 alt="" src="/icons/ecblank.gif" width=1 border=0></TD>
<TD width=114>
<DIV align=center><FONT face=Arial size=2>Editable - Required</FONT></DIV></TD>
<TD width=420><FONT face=Arial size=2>The bid status field displays the status of the contractors bid. The following are the 5 different types of status:</FONT>
<UL>
<OL type=1>
<LI><FONT face=Arial size=2>Apparent - All newly entered bids start out with this status and can still be modified.</FONT>
<LI><FONT face=Arial size=2>Verified - PENNDOT verifies that the contractors information is correct or has been fixed.</FONT>
<LI><FONT face=Arial size=2>Reject - PENNDOT has not accepted the bid because of a high bid or procedural error by the contractor.</FONT>
<LI><FONT face=Arial size=2>Withdrawals - Contractor withdrawals their bid.</FONT>
<LI><FONT face=Arial size=2>Award - PENNDOT awards the contract to a contractor. </FONT></LI></OL></UL></TD></TR>
<TR vAlign=top>
<TD width=84><FONT face=Arial size=2>Contractor</FONT></TD>
<TD width=114>
<DIV align=center><FONT face=Arial size=2>Editable - Required</FONT></DIV></TD>
<TD width=420><FONT face=Arial size=2>Containing contractor information (company name and address).</FONT></TD></TR>
<TR vAlign=top>
<TD width=84><FONT face=Arial size=2>Bid Amount</FONT></TD>
<TD width=114>
<DIV align=center><FONT face=Arial size=2>Editable - Required</FONT></DIV></TD>
<TD width=420><FONT face=Arial size=2>Contains total amount of the contractors bid. </FONT></TD></TR>
<TR vAlign=top>
<TD width=84><FONT face=Arial size=2>Created By</FONT></TD>
<TD width=114>
<DIV align=center><FONT face=Arial size=2>Protected</FONT></DIV></TD>
<TD width=420><FONT face=Arial size=2>Populated by the system with the users name who is creating the bid document.</FONT></TD></TR>
<TR vAlign=top>
<TD width=84><FONT face=Arial size=2>Created On</FONT></TD>
<TD width=114>
<DIV align=center><FONT face=Arial size=2>Protected</FONT></DIV></TD>
<TD width=420><FONT face=Arial size=2>Populated by the system the day the bid document was created.</FONT></TD></TR>
<TR vAlign=top>
<TD width=84><FONT face=Arial size=2>Modified On</FONT></TD>
<TD width=114>
<DIV align=center><FONT face=Arial size=2>Protected</FONT></DIV></TD>
<TD width=420><FONT face=Arial size=2>Populated by the system the day the bid document was changed.</FONT></TD></TR></TBODY></TABLE></BLOCKQUOTE><BR>
<H2 class=form>Actions</H2>
<BLOCKQUOTE>
<P>
<TABLE border=1>
<TBODY>
<TR vAlign=top>
<TD width=132><B><I><FONT face=Arial size=2>Note:</FONT></I></B><I><FONT face=Arial size=2> Buttons clicked</FONT></I></TD>
<TD width=384><B><I><FONT face=Arial size=2>Note:</FONT></I></B><I><FONT face=Arial size=2> The following identifies all possible buttons, links and check boxes that may appear for this screen. However they may not ALL appear depending on the sequence of events and the authority of the user.</FONT></I></TD></TR>
<TR vAlign=top>
<TD width=132><IMG height=1 alt="" src="/icons/ecblank.gif" width=1 border=0></TD>
<TD width=384><FONT face=Arial size=2>Selecting this button will save the current document and then display a new screen to add a new contractors bid. mode. Only authorized PENNDOT users will have access and view rights to this button.</FONT></TD></TR>
<TR vAlign=top>
<TD width=132><FONT face=Arial size=2>Add new Contract</FONT></TD>
<TD width=384><FONT face=Arial size=2>Selecting this button will display a screen where a new contract document can be created for a contract number. Only authorized PennDOT users will have access and view rights to this button.</FONT></TD></TR>
<TR vAlign=top>
<TD width=132><FONT face=Arial size=2>Back</FONT></TD>
<TD width=384><FONT face=Arial size=2>When the user clicks the Back button, the previous page viewed will be displayed.</FONT></TD></TR>
<TR vAlign=top>
<TD width=132><FONT face=Arial size=2>Edit</FONT></TD>
<TD width=384><FONT face=Arial size=2>When the user clicks the Edit button, the screen will be displayed in Edit mode. Only authorized PennDOT users will have access and view rights to this button.</FONT></TD></TR>
<TR vAlign=top>
<TD width=132><FONT face=Arial size=2>Delete </FONT></TD>
<TD width=384><FONT face=Arial size=2>When the user clicks the Delete button, the document will be deleted. Only authorized PennDOT users will have access and view rights to this button.</FONT></TD></TR>
<TR vAlign=top>
<TD width=132><FONT face=Arial size=2>Home</FONT></TD>
<TD width=384><FONT face=Arial size=2>Returns to the home page of the function.</FONT></TD></TR>
<TR vAlign=top>
<TD width=132><FONT face=Arial size=2>Previous</FONT></TD>
<TD width=384><FONT face=Arial size=2>Displays the bid document that resides before the one being viewed. If none exist then the view will be displyed.</FONT></TD></TR>
<TR vAlign=top>
<TD width=132><FONT face=Arial size=2>Next</FONT></TD>
<TD width=384><FONT face=Arial size=2>Displays the bid document that resides after the one being viewed. If none exist then the view will be displyed.</FONT></TD></TR>
<TR vAlign=top>
<TD width=132><FONT face=Arial size=2>Reject</FONT></TD>
<TD width=384><FONT face=Arial size=2>Rejects the bid from the contractor, sets the status on the bid document to rejected. Only authorized PENNDOT users will have access and view rights to this button.</FONT></TD></TR>
<TR vAlign=top>
<TD width=132><FONT face=Arial size=2>Withdrawal</FONT></TD>
<TD width=384><FONT face=Arial size=2>Withdrawals the contrators bid, sets the status on the bid document to withdrawaled. Only authorized PENNDOT users will have access and view rights to this button.</FONT></TD></TR>
<TR vAlign=top>
<TD width=132><FONT face=Arial size=2>Save</FONT></TD>
<TD width=384><FONT face=Arial size=2>Saves the bid document, returns to read mode. Only authorized PennDOT users will have access and view rights to this button.</FONT></TD></TR></TBODY></TABLE></P></BLOCKQUOTE>

Overview

Contract bids are open, checked, read, and entered into the bid screen immediately on bid letting day. Once bids results are entered and saved they will immediately be posted onto the ECMS Web site for the Web community to view. Bids are displayed by the lowest to the highest bidder amount per contract.




Fields

State
Letting Date
Protected
The date that the contract was opened, read, checked and the results announced.
Protected
Contains the contract number (CMS number).
Editable - Required
The bid status field displays the status of the contractors bid. The following are the 5 different types of status:
    1. Apparent - All newly entered bids start out with this status and can still be modified.
    2. Verified - PENNDOT verifies that the contractors information is correct or has been fixed.
    3. Reject - PENNDOT has not accepted the bid because of a high bid or procedural error by the contractor.
    4. Withdrawals - Contractor withdrawals their bid.
    5. Award - PENNDOT awards the contract to a contractor.
Contractor
Editable - Required
Containing contractor information (company name and address).
Bid Amount
Editable - Required
Contains total amount of the contractors bid.
Created By
Protected
Populated by the system with the users name who is creating the bid document.
Created On
Protected
Populated by the system the day the bid document was created.
Modified On
Protected
Populated by the system the day the bid document was changed.

Actions

Note: Buttons clicked Note: The following identifies all possible buttons, links and check boxes that may appear for this screen. However they may not ALL appear depending on the sequence of events and the authority of the user.
Selecting this button will save the current document and then display a new screen to add a new contractors bid. mode. Only authorized PENNDOT users will have access and view rights to this button.
Add new Contract Selecting this button will display a screen where a new contract document can be created for a contract number. Only authorized PennDOT users will have access and view rights to this button.
Back When the user clicks the Back button, the previous page viewed will be displayed.
Edit When the user clicks the Edit button, the screen will be displayed in Edit mode. Only authorized PennDOT users will have access and view rights to this button.
Delete When the user clicks the Delete button, the document will be deleted. Only authorized PennDOT users will have access and view rights to this button.
Home Returns to the home page of the function.
Previous Displays the bid document that resides before the one being viewed. If none exist then the view will be displyed.
Next Displays the bid document that resides after the one being viewed. If none exist then the view will be displyed.
Reject Rejects the bid from the contractor, sets the status on the bid document to rejected. Only authorized PENNDOT users will have access and view rights to this button.
Withdrawal Withdrawals the contrators bid, sets the status on the bid document to withdrawaled. Only authorized PENNDOT users will have access and view rights to this button.
Save Saves the bid document, returns to read mode. Only authorized PennDOT users will have access and view rights to this button.



Previous Page


Created by
Joseph D Howe/PennDOT
on 03/16/2005 at 10:48:34 AM