Package: 38943District: 09 SR/Sec: 0219/47E Type: ED 1b Evaluation Project: US 219 Boynton Temporary Bridge
MPMS: 122613County: Somerset Status: ApprovedFPN: N/A

Package Document


Funding

 Federal Funding?NoFederal Oversight?N/A Federal Oversight Agreement (June 2015)



Type

 Is this project being documented as an emergency project? Yes    No 



Is there a formal Emergency Declaration by either the  
President of the United States or the Governor of PA?

 Yes    No

In accordance with 23 CFR 771.117(c), actions that qualify as an emergency repair under 23 USC 125
can be documented as a Level 1a CE under item #9.

For emergency repairs, after generating the package, use the Add Appendix button to attach the
Damage Inspection Report (DIR).

 




Which type of repair does this project involve?

 Emergency
 Permanent






 
Phase:  
Evaluation

 
Classification:  
Environmental Documentation (ED)

 
ED Level:  
1b
 
       The preferred process for creating an Evaluation is to use the Create Eval button from an existing Scoping to link it to this package.
              - If an approved Scoping Package does not exist in the Expert System, provide reason and explanation below.
              - If waived, provide direction/authority information.  For paper copies, include file location.
Reason:  
 Waived    Paper Copy    Other

Explanation:  
Formal scoping waived due to emergency repairs due to flooding


Projects

 
PDOT Project Manager:  
Andrew Keirn
 
Federal Project Number:  
N/A

MPMS Projects
Lead?Status/TitleDistrict/CountySR/SecDescription
  122613Active /
US 219 Boynton Temporary Bridge
09 / Somerset0219 / 47EOn US 219 over Big Piney Run; Elk Lick Township; Temporary Bridge Construction
*The last time MPMS data was added or refreshed was on Tuesday, 27 May 2025 01:01 PM.


Project Funding & Fiscal Constraint
MPMSFD $ROW $UTL $CON $TIPLRTP Date
122613
      
Remarks: Refer to attached Authorization for Emergency Procurement 
For federally funded projects where the construction phase (and if needed, ROW and/or utilities phases) is not programmed on the current TIP, remarks provide a detailed reference to the current LRTP identifying full funding for the project.

"LRTP Date" is the date of the last adopted Long Range Transportation Plan.
Refer to May 2017 FHWA "Memorandum Clarifying Fiscal Constraint." See the help files for more detailed information.


Editors

 Names & Groups:Attilio S Squillario/PennDOT
All District 09 Users


Reviewers

System User NamesNon-System / Other Addresses
 Notify These Additional Emails Upon Approval:



Package was submitted on Tuesday, 27 May 2025 01:02 PM by Attilio S Squillario/PennDOT


 Email NotifyReviewed ByDate/Time
 
EM:
Sarah K Mcclellan/PennDOT
Sarah K Mcclellan/PennDOTWed, 05/28/25 09:08 AM
 
ADE:
James T Pruss/PennDOT
James T Pruss/PennDOTWed, 05/28/25 03:54 PM
 
DE:
Vince S Greenland/PennDOT
Vince S Greenland/PennDOTThu, 05/29/25 12:52 PM




Document Created By:  Attilio S Squillario
05/27/25  07:51 AM

Last Modified By:  Vince S Greenland
05/29/25  12:52 PM

 
An ECMS PDC was not found for MPMS 122613 -- clearance milestone was queued for future use.<br>XML REQUEST for MPMS 122613...
<?xml version="1.0" encoding="utf-8"?>
<soap:Envelope xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xmlns:xsd="http://www.w3.org/2001/XMLSchema" xmlns:soap="http://schemas.xmlsoap.org/soap/envelope/">
<soap:Body>
<updateCEEChecklistItem xmlns="https://www.ECMS.penndot.pa.gov/ECMSWebService/services/WSCEESInterface/updateCEEChecklistItemResponse">
<userId>ceeUser1</userId>
<password>ceeUser1</password>
<ecmsProjectNum>122613</ecmsProjectNum>
<ceeItemNumber>38943</ceeItemNumber>
<clItemNumber>01</clItemNumber>
<actionDate>2025/05/29</actionDate>
<clApprBy>Vince S Greenland</clApprBy>
<ceeDocLink><![CDATA[https://www.dominoappsbp.penndot.pa.gov/ceea/ceeamain03.nsf?Open&UrlPackageId=38943]]></ceeDocLink>
</updateCEEChecklistItem>
</soap:Body>
</soap:Envelope>
-----------------------------------------------------------------------------
XML RESPONSE for MPMS 122613...
<soapenv:Envelope xmlns:soapenv="http://schemas.xmlsoap.org/soap/envelope/" xmlns:soapenc="http://schemas.xmlsoap.org/soap/encoding/" xmlns:xsd="http://www.w3.org/2001/XMLSchema" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance"><soapenv:Header/><soapenv:Body><p461:updateCEEChecklistItemResponse xmlns:p461="http://webservices.ecms.dot.state.pa.us"><updateCEEChecklistItemReturn><errorMessage/><ceeItemQueued>1</ceeItemQueued><result>SUCCESS</result></updateCEEChecklistItemReturn></p461:updateCEEChecklistItemResponse></soapenv:Body></soapenv:Envelope>
-----------------------------------------------------------------------------
YesMilestone PE Phase data successfully sent for MPMS 122613<br>XML REQUEST for MPMS 122613...
<?xml version="1.0" encoding="utf-8"?>
<soapenv:Envelope xmlns:soapenv="http://schemas.xmlsoap.org/soap/envelope/" xmlns:web="http://webservice.mpms.dot.state.pa.us">
<soapenv:Header/>
<soapenv:Body>
<web:updateCeMilestone>
<milestoneDT>05/29/2025</milestoneDT>
<milestoneID>00450</milestoneID>
<mpmsNumber>122613</mpmsNumber>
</web:updateCeMilestone>
</soapenv:Body>
</soapenv:Envelope>
-----------------------------------------------------------------------------
XML RESPONSE for MPMS 122613...
<soap:Envelope xmlns:soap="http://schemas.xmlsoap.org/soap/envelope/"><soap:Body><ns2:updateCeMilestoneResponse xmlns:ns2="http://webservice.mpms.dot.state.pa.us"><return>false</return></ns2:updateCeMilestoneResponse></soap:Body></soap:Envelope>
-----------------------------------------------------------------------------
Yes