Package: 37809District: 12 SR/Sec: 0331/N10 Type: ED BRPA Scoping Project: PA 331 over Br Brush Run #2-DFB
MPMS: 81943County: Washington Status: ApprovedFPN: N/A

Package Document


Funding

 Federal Funding?NoFederal Oversight?N/A Federal Oversight Agreement (June 2015)



Type

 Is this project being documented as an emergency project? Yes    No 

 
Phase:  
Scoping   --- Values are prefilled from the PennDOT Connects system based on matching MPMS selections below.
  --- Classification / Environmental Level is determined on the scoping Results form.


Projects

 
PDOT Project Manager:  
Mike S Temoshenka
 
Federal Project Number:  
N/A

MPMS Projects
Lead?Status/TitleDistrict/CountySR/SecDescription
  81943Candidate /
PA 331 over Br Brush Run #2-DFB
12 / Washington0331 / N10SR 331 over branch of Brush Run #2-DFB; Hopewell Township, Washington County; Bridge Improvements
*The last time MPMS data was added or refreshed was on Tuesday, 17 September 2024 10:30 AM.


Project Funding & Fiscal Constraint
MPMSFD $ROW $UTL $CON $TIPLRTP Date
81943
 25,00025,000150,000FFY 2025 SPC TIP 
For federally funded projects where the construction phase (and if needed, ROW and/or utilities phases) is not programmed on the current TIP, remarks provide a detailed reference to the current LRTP identifying full funding for the project.

"LRTP Date" is the date of the last adopted Long Range Transportation Plan.
Refer to May 2017 FHWA "Memorandum Clarifying Fiscal Constraint." See the help files for more detailed information.


Editors

 Names & Groups:David Durofchalk/PennDOT
Kristin D Scarr/PennDOT
Mike S Temoshenka/PennDOT

All District 12 Users


Reviewers

System User NamesNon-System / Other Addresses
 Notify These Additional Emails Upon Approval:Alexander Genovese/PennDOT
Gary L Barber/PennDOT
Mike S Temoshenka/PennDOT
Ryan J Thorn/PennDOT



Package was submitted on Friday, 21 March 2025 06:33 AM by Mike S Temoshenka/PennDOT


 Email NotifyReviewed ByDate/Time
 
EM:
Kristin D Scarr/PennDOT
Kristin D Scarr/PennDOTFri, 03/28/25 10:45 AM
 
Project level of complexity on Results document is "Non-Complex (Minor)"




Document Created By:  Kristin D Scarr
09/17/24  10:35 AM

Last Modified By:  Kristin D Scarr
03/28/25  10:46 AM

 
An ECMS PDC was not found for MPMS 81943 -- clearance milestone was queued for future use.<br>XML REQUEST for MPMS 81943...
<?xml version="1.0" encoding="utf-8"?>
<soap:Envelope xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xmlns:xsd="http://www.w3.org/2001/XMLSchema" xmlns:soap="http://schemas.xmlsoap.org/soap/envelope/">
<soap:Body>
<updateCEEChecklistItem xmlns="https://www.ECMS.penndot.pa.gov/ECMSWebService/services/WSCEESInterface/updateCEEChecklistItemResponse">
<userId>ceeUser1</userId>
<password>ceeUser1</password>
<ecmsProjectNum>81943</ecmsProjectNum>
<ceeItemNumber>37809</ceeItemNumber>
<clItemNumber>03</clItemNumber>
<actionDate>2025/03/28</actionDate>
<clApprBy>Kristin D Scarr</clApprBy>
<ceeDocLink><![CDATA[https://www.dominoappsbp.penndot.pa.gov/ceea/ceeamain03.nsf?Open&UrlPackageId=37809]]></ceeDocLink>
</updateCEEChecklistItem>
</soap:Body>
</soap:Envelope>
-----------------------------------------------------------------------------
XML RESPONSE for MPMS 81943...
<soapenv:Envelope xmlns:soapenv="http://schemas.xmlsoap.org/soap/envelope/" xmlns:soapenc="http://schemas.xmlsoap.org/soap/encoding/" xmlns:xsd="http://www.w3.org/2001/XMLSchema" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance"><soapenv:Header/><soapenv:Body><p461:updateCEEChecklistItemResponse xmlns:p461="http://webservices.ecms.dot.state.pa.us"><updateCEEChecklistItemReturn><errorMessage/><ceeItemQueued>1</ceeItemQueued><result>SUCCESS</result></updateCEEChecklistItemReturn></p461:updateCEEChecklistItemResponse></soapenv:Body></soapenv:Envelope>
-----------------------------------------------------------------------------
Yes