Package: 37484District: 09 SR/Sec: 0453/14B Type: ED 1b Reevaluation Project: PA 453 Sink Run Culvert
MPMS: 98732County: Blair Status: ApprovedFPN: N/A

Package Document

Related Packages:  27418 (Scoping - Approved 11/08/21)   |  32917 (Eval - Approved 07/20/22)   |  36779 (Reeval - Approved 02/14/24)

Funding

 Federal Funding?NoFederal Oversight?N/A Federal Oversight Agreement (June 2015)



Type

 Is this project being documented as an emergency project? Yes    No 

 
Phase:  
Reevaluation

 
Classification:  
Environmental Documentation (ED)

 
ED Level:  
1b

 
Reevaluation Reason:  
 Change in scope, impacts and/or mitigation.
 Three or more years since major authorization or phase change.
 Other:

Summary of Reevaluation Changes by Document

Part A: Engineering Information
Proposed Design Criteria has been completed (Bridge Project).

Part B: Section A-2
Check mark has been added for "Other" under documentation to indicate that an asbestos inspection was completed. Under Permanent and Temporary Impacts - the verbiage pertaining to the underground storage tanks located at 1316 - 1318 has been removed since it has been confirmed by PennDOT that the underground storage tanks were removed during a previous PennDOT project. Verbiage pertaining to the residential apartment building and the need for asbestos sampling has been removed due to the building burning down in 2022. Verbiage has been added to indicate that an asbestos test was completed for the project and that asbestos containing material was present on the gas line pipe wrap within the culvert. Describe remediation/mitigation - This section has been updated to account for the removal of the underground storage tanks located at 1316-1318 Pennsylvania Avenue and that special provisions have been prepared because it is unknown if confirmatory soil sampling occurred once the tanks were removed and there is a potential for contaminated soil and/or groundwater to exist at this location. Verbiage has been added indicating that an asbestos inspection was completed during Final Design in August 2024 on the culvert and associated utility lines to be replaced since it was constructed prior to 1986. Additional language regarding special provisions relating to the handling/disposal of asbestos containing materials were developed in Final Design has also been included. All verbiage regarding Phase II/III sampling has been removed as well as all verbiage pertaining to the asbestos sampling for the residential apartment building located at 1316 - 1318 Pennsylvania Avenue. Remarks Section - this section has been updated to indicate that the underground storage tanks at 1316 - 1318 Pennsylvania Avenue have been removed during a previous PennDOT project but there is still a potential for contaminated soil and/or groundwater to exist at this location.

Part B: Section A-3
PNDI ran 1/29/24; Conservation measure and Avoidance Measure was added. PNDI is attached.

Part B: Section A-7
The Right-of-Way Acquisitions/Displacements section was updated. Due to the residential apartment building located at 1316-1318 Pennsylvania Avenue burning down in 2022, there will be no displacements associated with the project now. The description regarding the extent and locations of the acquisitions (temporary construction easement) has been revised as well for parcel 20 due to the residential apartment building burning down in 2022.

Part B: Section E
Other Mitigation Commitments - Resource Specific (Hazardous or Residual Waste Sites). Mitigation Measures have been updated to account for the development of special provisions that have been prepared for the potential to encounter contaminated soil and/or groundwater near 1316-1318 Pennsylvania Avenue where underground storage tanks used to exist. Verbiage has been added that indicates that an asbestos inspection was completed in August 2024 and special provisions relating to the handling/disposal of asbestos containing materials were developed.

Part C
Preparer title and date fields were updated.

Confirmation of Reevaluation Classification and Level

 Upon reevaluation, as supported by the attached documentation, this project qualifies as a ED Level 1b.


Projects

 
PDOT Project Manager:  
Garrett Berkey
 
Federal Project Number:  
N/A

MPMS Projects
Lead?Status/TitleDistrict/CountySR/SecDescription
  98732Active /
PA 453 Sink Run Culvert
09 / Blair0453 / 14BOver Sink Run; Tyrone Borough; Bridge Replacement
*The last time MPMS data was added or refreshed was on Tuesday, 27 August 2024 02:03 PM.


Project Funding & Fiscal Constraint
MPMSFD $ROW $UTL $CON $TIPLRTP Date
98732
   1,596,020
1,349,323
FFY 2023 Altoona TIP
FFY 2025 Altoona TIP
 
For federally funded projects where the construction phase (and if needed, ROW and/or utilities phases) is not programmed on the current TIP, remarks provide a detailed reference to the current LRTP identifying full funding for the project.

"LRTP Date" is the date of the last adopted Long Range Transportation Plan.
Refer to May 2017 FHWA "Memorandum Clarifying Fiscal Constraint." See the help files for more detailed information.


Editors

 Names & Groups:Ashley s Brehm/PennDOT BP-000243
Brad Fisher/PennDOT BP-000243
Jared M Govi/PennDOT BP-000243
Jason D Harkcom/PennDOT BP-000243
Jonathan Russick GIT/PennDOT BP-000243
Jonathon C Balko/PennDOT BP-000243
Susan Gerlach AICP/PennDOT BP-000243
Sarah K Mcclellan/PennDOT

All District 09 Users


Reviewers

System User NamesNon-System / Other Addresses
 Notify These Additional Emails Upon Approval:Jared M Govi/PennDOT BP-000243
Jonathon C Balko/PennDOT BP-000243



Package was submitted on Tuesday, 27 August 2024 02:04 PM by Sarah K Mcclellan/PennDOT


 Email NotifyReviewed ByDate/Time
 
EM:
Thomas R Yocum/PennDOT
Thomas R Yocum/PennDOTTue, 08/27/24 02:40 PM
 
ADE:
James T Pruss/PennDOT
James T Pruss/PennDOTTue, 08/27/24 02:55 PM
 
DE:
Vince S Greenland/PennDOT
Vince S Greenland/PennDOTTue, 08/27/24 03:21 PM




Document Created By:  Sarah K Mcclellan
07/25/24  08:26 AM

Last Modified By:  Vince S Greenland
08/27/24  03:21 PM

 
An ECMS PDC was found for MPMS 98732 -- clearance for package #37484 was successfully added/updated.<br>XML REQUEST for MPMS 98732...
<?xml version="1.0" encoding="utf-8"?>
<soap:Envelope xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xmlns:xsd="http://www.w3.org/2001/XMLSchema" xmlns:soap="http://schemas.xmlsoap.org/soap/envelope/">
<soap:Body>
<updateCEEChecklistItem xmlns="https://www.ECMS.penndot.pa.gov/ECMSWebService/services/WSCEESInterface/updateCEEChecklistItemResponse">
<userId>ceeUser1</userId>
<password>ceeUser1</password>
<ecmsProjectNum>98732</ecmsProjectNum>
<ceeItemNumber>37484</ceeItemNumber>
<clItemNumber>02</clItemNumber>
<actionDate>2024/08/27</actionDate>
<clApprBy>Vince S Greenland</clApprBy>
<ceeDocLink><![CDATA[https://www.dominoappsbp.penndot.pa.gov/ceea/ceeamain03.nsf?Open&UrlPackageId=37484]]></ceeDocLink>
</updateCEEChecklistItem>
</soap:Body>
</soap:Envelope>
-----------------------------------------------------------------------------
XML RESPONSE for MPMS 98732...
<soapenv:Envelope xmlns:soapenv="http://schemas.xmlsoap.org/soap/envelope/" xmlns:soapenc="http://schemas.xmlsoap.org/soap/encoding/" xmlns:xsd="http://www.w3.org/2001/XMLSchema" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance"><soapenv:Header/><soapenv:Body><p461:updateCEEChecklistItemResponse xmlns:p461="http://webservices.ecms.dot.state.pa.us"><updateCEEChecklistItemReturn><errorMessage/><ceeItemQueued>0</ceeItemQueued><result>SUCCESS</result></updateCEEChecklistItemReturn></p461:updateCEEChecklistItemResponse></soapenv:Body></soapenv:Envelope>
-----------------------------------------------------------------------------
YesMilestone PE Phase data successfully sent for MPMS 98732<br>XML REQUEST for MPMS 98732...
<?xml version="1.0" encoding="utf-8"?>
<soapenv:Envelope xmlns:soapenv="http://schemas.xmlsoap.org/soap/envelope/" xmlns:web="http://webservice.mpms.dot.state.pa.us">
<soapenv:Header/>
<soapenv:Body>
<web:updateCeMilestone>
<milestoneDT>08/27/2024</milestoneDT>
<milestoneID>00130</milestoneID>
<mpmsNumber>98732</mpmsNumber>
</web:updateCeMilestone>
</soapenv:Body>
</soapenv:Envelope>
-----------------------------------------------------------------------------
XML RESPONSE for MPMS 98732...
<soap:Envelope xmlns:soap="http://schemas.xmlsoap.org/soap/envelope/"><soap:Body><ns2:updateCeMilestoneResponse xmlns:ns2="http://webservice.mpms.dot.state.pa.us"><return>true</return></ns2:updateCeMilestoneResponse></soap:Body></soap:Envelope>
-----------------------------------------------------------------------------
Yes