Package: 37111District: 10 SR/Sec: 0068/376 Type: CE 1b Reevaluation Project: PA 68 Dolby Street to Trout Run
MPMS: 106502County: Clarion Status: ApprovedFPN: T103275

Package Document

Related Packages:  29978 (Scoping - Approved 02/13/20)   |  30592 (Eval - Approved 07/19/21)

Funding

 Federal Funding?YesFederal Oversight?No Federal Oversight Agreement (June 2015)



Type

 Is this project being documented as an emergency project? Yes    No 

 
Phase:  
Reevaluation

 
Classification:  
Categorical Exclusion (Class II)

 
CE Level:  
1b

CE Action:  
13         
 04       05       06       07       08       09
 10       11       12       13       14       Other                  

 
Reevaluation Reason:  
 Change in scope, impacts and/or mitigation.
 Three or more years since major authorization or phase change.
 Other:

Summary of Reevaluation Changes by Document

Part A: General Project Identification and Description
Revised plan set uploaded.

Part B: Section A-1
Stream section and floodplain section revised to reflect impact numbers and descriptions that were included in the Joint Permit submission.

Part B: Section A-3
Revised PNDI receipt uploaded and revised text.

Confirmation of Reevaluation Classification and Level

 Upon reevaluation, as supported by the attached documentation, this project qualifies as a CE Level 1b.


Projects

 
PDOT Project Manager:  
Amanda L Olbeter
 
Federal Project Number:  
T103275

MPMS Projects
Lead?Status/TitleDistrict/CountySR/SecDescription
  106502Active /
PA 68 Dolby Street to Trout Run
10 / Clarion0068 / 376Along PA 68 from 0.07 mile south of the Monroe Township line to Trout Run ; Monroe and Clarion Townships; New Alignment/Bridge Replacement
*The last time MPMS data was added or refreshed was on Tuesday, 04 June 2024 10:10 AM.


Project Funding & Fiscal Constraint
MPMSFD $ROW $UTL $CON $TIPLRTP Date
106502
420,0002,005,160
275,000
646,3659,141,605
5,483,053
FFY 2023 Northwest TIP
FFY 2025 Northwest TIP
 
For federally funded projects where the construction phase (and if needed, ROW and/or utilities phases) is not programmed on the current TIP, remarks provide a detailed reference to the current LRTP identifying full funding for the project.

"LRTP Date" is the date of the last adopted Long Range Transportation Plan.
Refer to May 2017 FHWA "Memorandum Clarifying Fiscal Constraint." See the help files for more detailed information.


Editors

 Names & Groups:Alan J Dunay/PennDOT BP-000092
DAVID COOPER/PennDOT BP-000011
DAVID WILLIS/PennDOT BP-000011
Jessica L Rizzilli/PennDOT
Jessica L Schrecengost/PennDOT
Katilin B Bomboy/PennDOT BP-000092
Matthew J Mucha/PennDOT
Robert C Nuss/PennDOT BP-000011
Trent A Sustich/PennDOT BP-000092

All District 10 Users


Reviewers

System User NamesNon-System / Other Addresses
 Notify These Additional Emails Upon Approval:Amanda L Olbeter/PennDOT
Carla Studebaker/PennDOT
Kathy J Reeger/PennDOT
Michael J Zizan/PennDOT BP-000092
Robert C Nuss/PennDOT BP-000011



Package was submitted on Tuesday, 04 June 2024 10:13 AM by Jessica L Schrecengost/PennDOT


 Email NotifyReviewed ByDate/Time
 
EM:
Jessica L Schrecengost/PennDOT
Jessica L Schrecengost/PennDOTTue, 06/04/24 10:13 AM
 
ADE:
Alice M Hammond/PennDOT
Alice M Hammond/PennDOTTue, 06/04/24 04:25 PM
 
DE:
Brian N Allen/PennDOT
Brian N Allen/PennDOTWed, 06/05/24 03:35 PM




Document Created By:  Jessica L Schrecengost
05/06/24  08:53 AM

Last Modified By:  Brian N Allen
06/05/24  03:36 PM

 
An ECMS PDC was found for MPMS 106502 -- clearance for package #37111 was successfully added/updated.<br>XML REQUEST for MPMS 106502...
<?xml version="1.0" encoding="utf-8"?>
<soap:Envelope xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xmlns:xsd="http://www.w3.org/2001/XMLSchema" xmlns:soap="http://schemas.xmlsoap.org/soap/envelope/">
<soap:Body>
<updateCEEChecklistItem xmlns="https://www.ECMS.penndot.pa.gov/ECMSWebService/services/WSCEESInterface/updateCEEChecklistItemResponse">
<userId>ceeUser1</userId>
<password>ceeUser1</password>
<ecmsProjectNum>106502</ecmsProjectNum>
<ceeItemNumber>37111</ceeItemNumber>
<clItemNumber>02</clItemNumber>
<actionDate>2024/06/05</actionDate>
<clApprBy>Brian N Allen</clApprBy>
<ceeDocLink><![CDATA[https://www.dominoappsbp.penndot.pa.gov/ceea/ceeamain03.nsf?Open&UrlPackageId=37111]]></ceeDocLink>
</updateCEEChecklistItem>
</soap:Body>
</soap:Envelope>
-----------------------------------------------------------------------------
XML RESPONSE for MPMS 106502...
<soapenv:Envelope xmlns:soapenv="http://schemas.xmlsoap.org/soap/envelope/" xmlns:soapenc="http://schemas.xmlsoap.org/soap/encoding/" xmlns:xsd="http://www.w3.org/2001/XMLSchema" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance"><soapenv:Header/><soapenv:Body><p461:updateCEEChecklistItemResponse xmlns:p461="http://webservices.ecms.dot.state.pa.us"><updateCEEChecklistItemReturn><errorMessage/><ceeItemQueued>0</ceeItemQueued><result>SUCCESS</result></updateCEEChecklistItemReturn></p461:updateCEEChecklistItemResponse></soapenv:Body></soapenv:Envelope>
-----------------------------------------------------------------------------
YesMilestone PE Phase data successfully sent for MPMS 106502<br>XML REQUEST for MPMS 106502...
<?xml version="1.0" encoding="utf-8"?>
<soapenv:Envelope xmlns:soapenv="http://schemas.xmlsoap.org/soap/envelope/" xmlns:web="http://webservice.mpms.dot.state.pa.us">
<soapenv:Header/>
<soapenv:Body>
<web:updateCeMilestone>
<milestoneDT>06/05/2024</milestoneDT>
<milestoneID>00130</milestoneID>
<mpmsNumber>106502</mpmsNumber>
</web:updateCeMilestone>
</soapenv:Body>
</soapenv:Envelope>
-----------------------------------------------------------------------------
XML RESPONSE for MPMS 106502...
<soap:Envelope xmlns:soap="http://schemas.xmlsoap.org/soap/envelope/"><soap:Body><ns2:updateCeMilestoneResponse xmlns:ns2="http://webservice.mpms.dot.state.pa.us"><return>true</return></ns2:updateCeMilestoneResponse></soap:Body></soap:Envelope>
-----------------------------------------------------------------------------
Yes