Package: 36912District: 04 SR/Sec: 0081/590 Type: CE 2 Reevaluation Project: I-81 Exit 219
MPMS: 75976County: Susquehanna Status: ApprovedFPN: T045311Z001

Package Document

Related Packages:  6675 (Scoping - Approved 08/10/10)  |  11980 (Eval - Approved 02/12/20)

Funding

 Federal Funding?YesFederal Oversight?Yes Federal Oversight Agreement (June 2015)

Describe Federal Oversight:
TBD


Type

 Is this project being documented as an emergency project? Yes    No 

 
Phase:  
Reevaluation

 
Classification:  
Categorical Exclusion (Class II)

 
CE Level:  
2

CE Action:  
13         
 04       05       06       07       08       09
 10       11       12       13       14       Other                  

 
Reevaluation Reason:  
 Change in scope, impacts and/or mitigation.
 Three or more years since major authorization or phase change.
 Other:

Summary of Reevaluation Changes by Document

Part A: General Project Identification and Description
Wetland impact changed from 0.38 to 0.58 acres in project description

Part A: Engineering Information
Design Exceptions Section: Removed the following SR8007 (Ramp E) 1. Substandard SSD of 160 feet through the secondary curve (R=380’ at Vd=35 mph) 2. Substandard minimum length of circular arc for the leading compound curve (R=520 feet) with a length L=114.76 feet. Additional Information Section: Eliminated the need for detour SR848 (removed attached plansheets) and removed following statement: 1. Closure of SR 848 across the bridge during Stage 2 Phase B & C. Detour lengths are as follows: SR 848 EB is 5.1 miles and SR 848 WB is 8.7 miles. SR 0081 NB is 2.8 miles and SR 0081 SB is 4.7 miles. See attached detour plans.

Part B: Section A-1
Streams • Updated LF of Stream impact from 1,068 to 1,604 • Updated “Describe Any Permanent Impacts” to Nine Partners Creek and the UNTs (579 and 1025 LF) • Updated “Advanced Compensation” to 1,178LF • Mitigation Remarks: All stream mitigation will be completed off-site at a mitigation bank (Upper Susquehanna River – MB) in coordination with the resource agencies. • Remarks: Noted the date of the recent aquatic resources delineation in 2023. Wetlands • Methodology: On April 12-13, 2023, a wetland delineation was performed to update the aquatic resource delineation in the updated project study area. • Updated acres of permanent wetland impact from 0.38 to 0.58 • Updated “Describe Any Permanent Impacts” to show SF increases in impacts to Wetland A, G, and K. • Updated “Describe Any Temporary Impacts” to show AC/SF increases in impacts to Wetland K. • Added acres for "Banking" and "Bank to be Debited" (0.58ac / Upper Susquehanna River-Mitigation Bank)

Part B: Section A-2
Vegetation Section "Describe Mitigation" statement was revised to indicate that "Mitigation for wetland impacts will be completed during final design in consultation with the USACOE and PaDEP and be completed at wetland bank." Hazardous Waste Section - revised to note that a Phase II / III has been completed: Phase II / III testing investigation was conducted in 2024 regarding potential impacts from the Gibson Travel Plaza (GTP) facility. The GTP has been investigating past underground storage tank releases under agreement with the PADEP NE Regional Office. A groundwater remediation system was installed by the GTP in the vicinity of SR 848 - Eastern bridge approach. Groundwater monitoring wells and core boring - soil sampling and testing parameters were determined to be below the ACT2 SHS MSC criteria.

Part B: Section A-3
PNDI receipt was updated with current receipt (May 2023)

Part B: Section A-4
Remarks: Link to PATH was updated to the project page: https://path.penndot.pa.gov/ProjectDetails.aspx?ProjectID=1&txtMPMS=75976

Part B: Section A-6
Noise Receptor B-1 (Lackawanna College - School Of Petroleum and Natural Gas) closed and is no longer in the NSA (September 2024).

Part B: Section A-7
Updated the Right-of-way acquisitions from 14 to 18, and noted that 17 are partial takes and 1 total take. Noted that the total take, Property #14 (Ireno & Mary J. Monteforte), has no buildings and is situated between Ramp H and Oliver Rd. See attached DFV plans in the A: Gen Section.

Part B: Section D
Updated to note that Pre-Application meetings have been held on 8/16/22 Pre App (minutes attached), 4/26/23 Pre App (minutes attached), and 8/29/24 Pre App (minutes in progress, not available at this time).

Confirmation of Reevaluation Classification and Level

 Upon reevaluation, as supported by the attached documentation, this project qualifies as a CE Level 2.


Projects

 
PDOT Project Manager:  
Amy M Lolli
 
Federal Project Number:  
T045311Z001

MPMS Projects
Lead?Status/TitleDistrict/CountySR/SecDescription
  75976Active /
I-81 Exit 219
04 / Susquehanna0081 / 590Interchange/Safety Improvement on Interstate 81 (Exit 219) in Harford and New Milford Townships, Susquehanna County.
*The last time MPMS data was added or refreshed was on Wednesday, 04 September 2024 10:48 AM.


Project Funding & Fiscal Constraint
MPMSFD $ROW $UTL $CON $TIPLRTP Date
75976
5,800,0001,100,000 31,311,340
41,311,340
FFY 2023 Interstate TIP
FFY 2025 Interstate TIP
 
For federally funded projects where the construction phase (and if needed, ROW and/or utilities phases) is not programmed on the current TIP, remarks provide a detailed reference to the current LRTP identifying full funding for the project.

"LRTP Date" is the date of the last adopted Long Range Transportation Plan.
Refer to May 2017 FHWA "Memorandum Clarifying Fiscal Constraint." See the help files for more detailed information.


Editors

 Names & Groups:Ami M Gulden/PennDOT BP-000057
Amy M Lolli/PennDOT
Annalee R Woods/PennDOT BP-000057
Colleen Kelly/PennDOT BP-000083
Colleen Scott/PennDOT BP-000057
Mark D Geiser/PennDOT BP-000057
Melanie Attieh/PennDOT BP-000083
Thomas Friel/PennDOT BP-000057
Xavier Riva/PennDOT BP-000083
Zachary Smith/PennDOT BP-000083

All District 04 Users


Reviewers

System User NamesNon-System / Other Addresses
 Notify These Additional Emails Upon Approval:Amy M Lolli/PennDOT
Julianne Lawson/PennDOT
Marie Bishop/PennDOT



Package was submitted on Thursday, 05 September 2024 07:50 AM by Gregory P Augustine/PennDOT


 Email NotifyReviewed ByDate/Time
 
EM:
Gregory P Augustine/PennDOT
Gregory P Augustine/PennDOTThu, 09/05/24 07:50 AM
 
ADE:
Susan E Hazelton/PennDOT
Susan E Hazelton/PennDOTThu, 09/05/24 09:21 AM
 
HDTS: Eastern Region
Allen S Melley/PennDOT
Booker T Bates/PennDOT
Brian E Shunk/PennDOT
Edward J Castelli/PennDOT
Harrison Knox/PennDOT
Julius B Sanders/PennDOT
Keith A Saloum/PennDOT
Kerriann R Riddle/PennDOT
Michael P Erickson/PennDOT
Mithun R Patel/PennDOT
Nina Ertel/PennDOT
Ryan R Shiffler/PennDOT
Ryan Vankirk/PennDOT
Ryan R Shiffler/PennDOTThu, 09/05/24 11:10 AM
 
FHWA:
Andrea Ebur/PennDOT BP-001391
Benjamin Harvey/PennDOT BP-001391
Camille A Otto/PennDOT BP-001391
Christopher Walston/PennDOT BP-001391
Clint H Beck/PennDOT BP-001391
Douglas Tanaka/PennDOT BP-001391
Eugene Porochniak/PennDOT BP-001391
Ezequiel Lujan/PennDOT BP-001391
FHWA PA Division Resource Account/PennDOT BP-001391
George Fleagle/PennDOT BP-001391
Jeff Engle/PennDOT BP-001391
Jennifer Crobak/PennDOT BP-001391
John Bork/PennDOT BP-001391
Jonathan Buck/PennDOT BP-001391
Jonathan Crum/PennDOT BP-001391
Julia Moore/PennDOT BP-001391
Karyn Vandervoort/PennDOT BP-001391
Kenana Zejcirovic/PennDOT BP-001391
Kevin Harrison/PennDOT BP-001391
Mark Hammert/PennDOT BP-001391
Melanie Barber/PennDOT BP-001391
Michelle Goddard/PennDOT BP-001391
Natasha Manbeck/PennDOT BP-001391
Nhan T Phan/PennDOT BP-001391
Richard Kercher/PennDOT BP-001391
Ronnique Bishop/PennDOT BP-001391
Sarah Cordek/PennDOT BP-001391
Tony Mento/PennDOT BP-001391
Veronica L Feliciano/PennDOT BP-001391
Benjamin Harvey/PennDOT BP-001391Thu, 09/05/24 01:33 PM




Document Created By:  Amy M Lolli
03/22/24  01:26 PM

Last Modified By:  Benjamin Harvey
09/05/24  01:34 PM

 
An ECMS PDC was found for MPMS 75976 -- clearance for package #36912 was successfully added/updated.<br>XML REQUEST for MPMS 75976...
<?xml version="1.0" encoding="utf-8"?>
<soap:Envelope xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xmlns:xsd="http://www.w3.org/2001/XMLSchema" xmlns:soap="http://schemas.xmlsoap.org/soap/envelope/">
<soap:Body>
<updateCEEChecklistItem xmlns="https://www.ECMS.penndot.pa.gov/ECMSWebService/services/WSCEESInterface/updateCEEChecklistItemResponse">
<userId>ceeUser1</userId>
<password>ceeUser1</password>
<ecmsProjectNum>75976</ecmsProjectNum>
<ceeItemNumber>36912</ceeItemNumber>
<clItemNumber>02</clItemNumber>
<actionDate>2024/09/05</actionDate>
<clApprBy>Benjamin Harvey</clApprBy>
<ceeDocLink><![CDATA[https://www.dominoappsbp.penndot.pa.gov/ceea/ceeamain03.nsf?Open&UrlPackageId=36912]]></ceeDocLink>
</updateCEEChecklistItem>
</soap:Body>
</soap:Envelope>
-----------------------------------------------------------------------------
XML RESPONSE for MPMS 75976...
<soapenv:Envelope xmlns:soapenv="http://schemas.xmlsoap.org/soap/envelope/" xmlns:soapenc="http://schemas.xmlsoap.org/soap/encoding/" xmlns:xsd="http://www.w3.org/2001/XMLSchema" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance"><soapenv:Header/><soapenv:Body><p461:updateCEEChecklistItemResponse xmlns:p461="http://webservices.ecms.dot.state.pa.us"><updateCEEChecklistItemReturn><errorMessage/><ceeItemQueued>0</ceeItemQueued><result>SUCCESS</result></updateCEEChecklistItemReturn></p461:updateCEEChecklistItemResponse></soapenv:Body></soapenv:Envelope>
-----------------------------------------------------------------------------
YesMilestone PE Phase data successfully sent for MPMS 75976<br>XML REQUEST for MPMS 75976...
<?xml version="1.0" encoding="utf-8"?>
<soapenv:Envelope xmlns:soapenv="http://schemas.xmlsoap.org/soap/envelope/" xmlns:web="http://webservice.mpms.dot.state.pa.us">
<soapenv:Header/>
<soapenv:Body>
<web:updateCeMilestone>
<milestoneDT>09/05/2024</milestoneDT>
<milestoneID>00130</milestoneID>
<mpmsNumber>75976</mpmsNumber>
</web:updateCeMilestone>
</soapenv:Body>
</soapenv:Envelope>
-----------------------------------------------------------------------------
XML RESPONSE for MPMS 75976...
<soap:Envelope xmlns:soap="http://schemas.xmlsoap.org/soap/envelope/"><soap:Body><ns2:updateCeMilestoneResponse xmlns:ns2="http://webservice.mpms.dot.state.pa.us"><return>true</return></ns2:updateCeMilestoneResponse></soap:Body></soap:Envelope>
-----------------------------------------------------------------------------
Yes